BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Weyburn, Saskatchewan - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Weyburn, Saskatchewan
X-ORIGINAL-URL:https://weyburn.ca
X-WR-CALDESC:Events for Weyburn, Saskatchewan
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Regina
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20180101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Regina:20191029T160000
DTEND;TZID=America/Regina:20191029T190000
DTSTAMP:20260412T081236
CREATED:20191017T190247Z
LAST-MODIFIED:20191017T190413Z
UID:13233-1572364800-1572375600@weyburn.ca
SUMMARY:Weyburn Region Transportation Study - Information Session
DESCRIPTION:Tuesday\, October 29\n4 – 7 p.m.\nWeyburn Curling Club\nResidents in the Weyburn and surrounding area are invited to attend a come-and-go information session to discuss options and offer feedback for corridor improvement on two projects in the Weyburn area. \nThe Highway 6/39 North Corridor Improvements include safety and capacity improvements to the highway between Regina and Weyburn. \nThe Weyburn Region Transportation Study is being conducted to develop a road network plan that can safely and efficiently handle the traffic that will be generated by regional growth and development. \nFeedback is important and always welcome. \nTransportation engineers from the Ministry of Highways and Infrastructure\, SNC-Lavalin\, Stantec and WSP will be in attendance to listen to comments and answer any questions you may have. \nFor more information\, contact: Jonathan Sinclair at feedback@snclavalin.com or call (306) 546-4220 ext 55038. \n-30-
URL:https://weyburn.ca/calendar-event/highways-6-39-corridor-safety-improvements-weyburn-region-transportation-study/
LOCATION:Weyburn Curling Club\, City of Weyburn Fair Grounds\, Weyburn\, Saskatchewan\, S4H 2K3\, Canada
END:VEVENT
END:VCALENDAR